Florence Nightingale Garden
Florence Nightingale Garden
Public Realm
Client:
Burdett Trust
Team:
Landscape Architect: Robert Myers
Collaborating Engineer: Studio Allen
Main Contractor: Bowles and Wyer
Materials used:
25m3 Sap free Douglas Fir CLT and stainless steel.
Timeline:
3 weeks off site assembly, 3 days install at Chelsea. 2 days demount 4 days final installation.
Awards:
Structural Timber award shortlisted 2022.
Read More: Pergola
In celebration of modern nursing, Bowles & Wyer integrated innovative bio-based building materials within a hospital garden design at the 2021 Chelsea Flower Show.
Douglas Fir CLT was used in the construction of a pergola, nodding to Florence Nightingale’s work in advocating for the use of natural materials in hospital construction to promote healing and wellbeing.
The Florence Nightingale Garden will soon be implemented at St Thomas’ Hospital in London to create a permanent healing garden. A 60 foot timber pergola will span the length of the garden to enclose it on three sides and form the central feature.